Valiryo Body Dryer Installation Guide

Valiryo Full Body Dryer Installation and Usage Guide – Contact Us for Support

Contact Us

Choose the right column height for your bathroom or changing room

Our body dryer comes in two sizes: standard at 218 cm (85.83 in) and a shorter version at 195 cm (76.77 in) for spaces under 220 cm (86.6 in) in height. Choose the longer unit if you have enough height and follow these installation tips:


  • Valiryo 218: It is recommended to install Valiryo 10 cm above the floor if you have the sufficient height: 230 cm (90.5 in). If you do not have enough space, disregard this recommendation and adjust the length of Valiryo to fit the available space.
  • Valiryo 195: In the case of the short column, which is installed in spaces lower than 220 cm in height, the recommendation is to always install Valiryo 2 cm below the ceiling so that it is positioned as high as possible.

Note: In the Valiryo box, we include a template to help you calculate the height at which the body dryer should be placed based on your installation space.

and start enjoying our full body dryer in 5 easy steps

You can easily install Valiryo in your home or business without the need for a bathroom renovation. Simply choose a suitable location and set up the electrical connection (220-240V) to start enjoying its benefits right away. The installation process is similar to hanging a mirror with light: hanging and connecting.

Discover the entire process below to welcome Valiryo into your home and feel free to reach out if you have any doubts or questions. Our customer service is available to guide you both in choosing the most suitable space in your home or business for our body dryer, as well as to guide you through the installation and connection process..

Discover all the product features

STEP 1
SELECT THE PERFECT LOCATION FOR VALIRYO

Although our recommendation is to install it inside the shower, you can place it in many other locations. In this post, you can discover all the key points for installing Valiryo in the optimal spot.

STEP 2

PREPARE THE ELECTRICAL CONNECTION

You can get ahead with the work and prepare the connection point. Check out this post to learn all about its connection. Valiryo is already present in over 80 countries, as it's adapted to different electrical networks and compliant with the regulations of each market.

STEP 3

VALIRYO ARRIVES AT YOUR HOME

Valiryo arrives packaged in two boxes and includes everything necessary for its assembly, as well as a template and a step-by-step guide. In the unboxing video, we show you everything included in the box so you can locate it and teach you how to unpack it with the utmost care to avoid any loss or damage.

 Unboxing Video

STEP 4

THE INSTALLATION OF VALIRYO

The installation is very simple and does not require any type of renovation. You can do it yourself. The process is similar to hanging a mirror with some kind of light on the wall. In this post, you can discover all the details and watch a video with a step-by-step guide.

STEP 5

TIPS FOR USING VALIRYO

Now you can enjoy Valiryo. You will see that once you discover it, you won't be able to do without it. Its operation is very simple and intuitive, but it is very important that you read these usage tips so that you can get the best experience from the very first use.

Tips for using Valiryo

Do you want to start feeling a new sense of well-being right after your shower?

Forget forever the friction of the towel and the discomfort of drying yourself with it

Buy Now Valiryo

Valiryo Full Body Dryer Installation Videos


Where to Place Valiryo Body Dryer

How to Install Valiryo Body Dryer

How to Connect Valiryo Body Dryer

Common Questions about Body Dryer Installation

NOTE_If the answer to your question is not listed here, please do not hesitate to contact us.​